RaceDeck

TO ORDER CALL 1.800.457.0174 MADE IN THE USA
  • Step 1 Installation

    Step 1

    Clear any objects you do not want to cut around from your garage. Sweep excess dirt and dust from the floor.

  • Step 2 Installation

    Step 2

    Begin installation along the longest side wall and the garage door.

  • Step 3 Installation

    Step 3

    Lay two tiles on the ground with the lugs of one module aligned over the loops of another. Step firmly onto them to lock the lugs into the loops.

  • Step 3 Installation

    Step 4

    Lay a single row of tiles along the garage wall, leaving a 1/4” to 1/2" gap between it and the flooring.

  • Step 5 Installation

    Step 5

    Continue your installation across the garage door forming an “L” shape with your garage flooring.

  • Step 6 Installation

    Step 6

    Fill in the “L” by moving across the garage opening
    and down the longest wall repeatedly.

  • Step 7 Installation

    Step 7

    Cut the floor to any size or shape using a table saw, jigsaw, utility knife, etc.. Follow manufacturer’s safety guidelines with these tools.

  • Step 8 Installation

    Step 8

    Celebrate your choice of RaceDeck Garage Flooring by enjoying your favorite beverage while admiring your handy work.

Translate

Time Lapse Installation

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Testimonials

Need an unbiased opinion? See what real customers have to say.

[Watch & Read Testimonials]

Blog & Links

Read our Blog

Follow RaceDeck on Twitter

Become a fan of RaceDeck on FaceBook

See our RaceDeck channel on YouTube